Read before use
1, check data with precheck (windows version) tools
2, data from excel, copy and paste data into the input frame
3, data from txt, must tab-seperated, copy and paste data into the input frame
4, specieal and non-English characters such as #, <, >, %, (, ), α are not friendly
5, use point as decimal separator, not comma. e.g. 3.14, not 3,14 as pi
Required

Optional
Figure size
figure width:
figure height:

Fontsize
ticks fontsize: label fontsize:

Colors
start color:
middle color:
end color:

Sytles and Values


Fontfamily


Waterfall plot

Introduction
A waterfall plot is an ordered chart where each subject is symbolized by a vertical bar, which represents the maximum change with respect to a reference evaluation obtained during a specific period.
Input data instructions
Data contains two columns. The first column is usage, the second column is value. The first value and the last value are positive, others are negative values.
Input
time	money
total	100
day1	-10
day2	-8
day3	-12
day4	-5
day5	-7
day6	-9
day7	-8
final	41
Output

1) How to plot?
1, Put data in excel according to the example format.
2, Copy and paste into input frame.
3, Input pre-checking button to check input
4, After checking pass, select parameters, submit and download

2) How to cite?
4000+ papers in (Google Scholar)
Tang D, Chen M, Huang X, Zhang G, Zeng L, Zhang G, Wu S, Wang Y. SRplot: A free online platform for data visualization and graphing. PLoS One. 2023 Nov 9;18(11):e0294236. doi: 10.1371/journal.pone.0294236. PMID: 37943830.

3) FAQs